Scoring steps for new house decoration acceptance

2022-07-22
  • Detail

1. On site disclosure: the owner, designer, project supervisor and construction director shall participate in the on-site disclosure, so that the designer can explain the budget items, drawings, special processes and coordinate relevant procedures to the construction director on site. 2. Material acceptance formal home decoration companies need the owner to accept the materials before they are placed on the construction site. At this time, the owner should pay attention to whether it is consistent with the material details on the contract. Only after the owner signs, the decoration company

1. On site disclosure: the owner, designer, project supervisor and construction principal participate in the on-site disclosure, so that the designer can explain the budget items, drawings, special processes and coordinate with the construction principal in detail on site

2. Material acceptance formal home decoration companies need the owner to accept the materials before they are placed on the construction site. At this time, the owner should pay attention to whether it is consistent with the material details in the contract. The decoration company can carry out construction only after the owner signs

3. Intermediate acceptance in the intermediate acceptance, in addition to identifying the overall effect of decoration, the owner is more important to check whether the construction quality is satisfactory, generally from the following aspects

first of all, check whether the lighting circuit complies with the regulations. Sockets, lamp switches, master switches, leakage switches, etc. should be at a certain height. Kitchens and air conditioners should be placed with special lines to avoid mutual interference and magnetic fields. The TV antenna and telephone special line shall be installed at the position convenient for maintenance; Secondly, check whether the drainage is smooth, whether there is leakage, backflow and ponding, and whether the high-end plumbing hardware is scratched; Then check whether the newly stacked wall is vertical, whether the horizontal plane of the bricks is consistent, and whether the joints are uniform and neat. Finally, check the paint quality. It should be smooth, feel good, and free of cracks. It should look free of color difference and nail holes at one meter. The intermediate acceptance requires the participation of the owner, designer, project supervisor and person in charge of construction. The quality report can be signed for confirmation only after the acceptance is qualified

4. The final acceptance requires the participation of the owner, designer, project supervisor and construction director. The overall acceptance of engineering materials, design and process quality can be signed for confirmation only after it is qualified